MEP
Most contractors sub out MEP and lose control of the one package that decides the programme. Here is what changes when it runs under one roof.
On most projects, MEP is the package that decides whether you finish on time. It is also the package most contractors do not control. They sub it out, then spend the programme managing the gaps between trades that do not answer to them.
City Contracting executes the complete MEP scope in-house. Here is what that covers, and why it changes the outcome.
MEP is more than air conditioning and power. The full package runs across HVAC, electrical, plumbing and drainage, fire protection, and the specialist systems a modern building depends on: building management systems, ELV such as CCTV, access control, and structured cabling, and, for hospitality, guest room management systems. Each has to be designed, installed, and commissioned in coordination with every other trade on site.
When MEP is handed to separate subcontractors, coordination becomes someone else's problem. Ductwork clashes with cable trays. A slab opening is missed because two packages each assumed the other would flag it. When something goes wrong, the answer is a meeting, not a fix. The programme absorbs every one of those gaps.
Running MEP under one team removes the seams. Trades are sequenced against a single programme, coordinated before installation, and answerable to the same site management. When a clash appears, it is resolved on site, not escalated across three companies. Commissioning is planned from the start, not discovered at the end.
The result is a package that protects the programme instead of threatening it. For an owner, that is the difference between a handover date you can plan around and one that keeps moving.
Full MEP, executed in-house, coordinated across every trade. That is what keeps a project on its date.
BLOG
Field notes on execution, from MEP and occupied-site renovation to the last piece of furniture in the room.
didn't find what you're looking for? get in touch.
get in touch
