Planning
You’ve finalized your layout, selected your finishes, and are ready to begin construction. Then a new idea hits. You want to move a wall, change the...
You’ve finalized your layout, selected your finishes, and are ready to begin construction. Then a new idea hits. You want to move a wall, change the ceiling design, or swap the floor tiles.
Sounds simple, right?
In reality, late design changes are one of the most expensive and disruptive mistakes you can make in a renovation project.
At City Contracting, we follow a clear principle: all major design decisions must be locked before construction begins. Here's why, and how it protects your project from spiraling out of control.
Clients often think: “It’s just a small adjustment, it won’t affect much.”
But even a “small” change can trigger a chain reaction that affects:
By the time you realize the consequences, your team is either redoing work or halting progress, both of which cost time and money.
Every adjustment made after work begins adds cost in several ways:
We’ve seen clients spend thousands of dirhams on last-minute changes that could have been avoided with earlier planning.
A single design change can halt progress for days or even weeks:
This is especially critical in gated communities like Emaar, Nakheel, or Meydan, where resubmissions may be required. That means even more delays, and more frustration.
We’ve built a system to help clients make informed decisions before site work begins:
By doing all this upfront, we avoid 95% of the delays and cost surprises caused by design changes.
We always tell our clients: if you’re not 100% confident in the design, wait.
It’s far better to delay construction by a week than to waste time and money redoing work later. Great execution starts with great preparation, and that includes a locked design.